SHIUNN YANG ENTERPRISE CO., LTD.
 
SY-FRJ2-45-3 PLUG assembly instruction

 

Step.1
SY-FRJ2-45-3  PLUG PLUG
Shielded PLUG with insert, divider and plastic stopper.
Step.2
Cut off the shielding layer Cable stripped approximately 20-30mm.
Step.3
Push the insert and cable into the plug body with
precisely side. Put assembly into plug.
Step.4
Put the plug into a Crimping tool for Termination.
Step.5
Check the surface & wiring correctly.
Welding ground with the shield shell of the plug.
Step.6
(Option – SR Boot) Assembly into the RJ45 SR boot.
CAT6A Patch|SHIUNN YANG ENTERPRISE CO., LTD.

T:886-2-2908-9890(REP.) F:886-2-2908-8679
10F, No.659-1, Chung Cheng Rd., Hsin Chuang Dist.,New Taipei City, Taiwan

 
Copyright © 2018 Shiunn Yang Enterprise Co., Ltd All rights reserved.
PC version】【Mobile version